Kasenyi Port Infrastructure Upgrade

Kasenyi Port, on the DRC side of Lake Albert, juxtaposes the Port of Ntoroko on the Uganda side. Lake Albert provides a trading route across water to the city of Bunia and the hinterland, until Kisangani. The project aims to.

Period
2017 - 2021
Countries
DR Congo
Implementing partners
--
Participants
Project Value

Project rationale

Kasenyi Port, on the DRC side of Lake Albert, juxtaposes the Port of Ntoroko on the Uganda side. Lake Albert provides a trading route across water to the city of Bunia and the hinterland, until Kisangani. The project aims to rehabilitate the infrastructure at the Port. The jetty will be renovated, with the first 112 metres requiring a small amount of refurbishment, but the basic construction is generally considered to be sound. The top surface of this 112 metres will be paved with reinforced concrete. The old fixed crane structure and rails crane will be dismantled and removed from the site. The remaining 51 metres of the jetty will be paved to take the weight of the mobile cranes. Capstans and new rails will be installed.

Project approval summary:

Responsibility Center: 22_DRC

  • PAR approval date: June 2016
  • PAR number: DRC CBT PAR
  • PAR approval authority: Board

More projects in Physical Connectivity: Ports, Borders, Roads

Lake Kivu Harbour Transport Project

A Design and Supervise Consultant was contracted to review the port designs, prepare tender documents for the construction, and supervise th…